2003  Pictorial Page 1 2 3 4 5 6 7 8

1999 2000 2001 2002 2003 2004  2005 2006

May, 2003 saw the completion of the Edziza Tunnel Project. For the technical at heart, track is laid on a 1x4 inch plank and screwed down.
It is then soldered together to get absolute electrical continuity. The joints at each end are connected using rail clamps, so the section can be lifted should the need arise.

Everything is screwed in place and then the plywood and fence were sealed using plastic to protect from rot.
Dirt was back-filled on top and some shade-loving plants put in. Cut granite slabs were placed in front to give the "mountain" effect.

2003 Garden Railway Pictorial Page 1 2 3 4 5 6 7 8
2003 Page 6 Home 2003 Page 8
This page was last updated on 03 Jan 2014.

Skeena Pacific Railway is a wholly-owned,

 
 1/29th subsidiary of  Skeena Pacific Consolidated, a Gilham Family  Enterprise.
Our Pitt Meadows Weather Station is located at 2km northeast of  Pitt Meadows Airport

Skeena Pacific Railway

Bliss Bakery

Skeena Pacific Family Sites

Analogue to Digital - Your Challenge is Our Business      Send mail to the web master with questions or comments about this web site.
Copyright © 1976 - 2014 Skeena Pacific Consolidated  Last modified: 03 Jan 2014